Can you claim GST credit on your solar plant? It depends on how the plant is connected.

Five answers about the plant. You get the credit you can claim, what to reverse or what is at risk, the rulings behind it, and what would make it safer.

CGST sections 16 and 17 · Rules 42 and 43 · Rulings checked 17 Oct 2026
1Describe the plant
2Read your position
3Print the position note

1The plant

5 answers
Where is the plant?
Same GSTIN or "additional place of business" does not change the answer — the rulings say so.
A plant away from your premises always reaches you through the grid — choose how it is connected.
Does your business sell anything GST-exempt?
Type the exempt share as a number from 1 to 100 — e.g. 20
A hospital's treatment, for example, is exempt.
From the export meter or the DISCOM bill over a year; 0 if nothing goes out.
Type a share from 0 to 100 — e.g. 15
Modules, inverters, mounting, batteries and the installation contract — the GST on the bills, not the cost. Split out civil works in the fold.
Type the GST as a number — e.g. 3800000

Everything else — open only what you need

Split the bill: equipment and civil works assumed: no civil works
Default 0. Control room building, boundary wall, roads, land levelling, drainage. Mounting structures and their foundations count as equipment.
If the plant is off your premises the three facts the 2026 ruling looked for
Is a wheeling and banking agreement signed and on record?
Follows the connection you chose above, and changes it if you change this.
Are generation and your consumption matched by meter readings each month?
The business and the letterhead for the note

Remembered on this device. “Chartered Accountants” prints under it.
Today, by default.
How this works

Why the connection decides it. Electricity is exempt from GST. If power from your plant counts as sold to the DISCOM, the credit on the plant goes with it.

The 2026 rulings. Rajasthan's appellate authority (May 2026) said power injected into the grid with no banking agreement belongs to the DISCOM, and denied all credit; Tamil Nadu had done the same in 2025. A Madras High Court writ is pending. Confirm with your CA

On your premises. Power you use where it is made, with nothing exported, has kept full credit in the rulings. Export a share and you claim it all and reverse that share month by month over five years.

Civil works. Mounting structures and their foundations are equipment. Buildings, boundary walls and roads are blocked.

The power-sector push. The 2026 captive power rules and Chhattisgarh's virtual net metering make off-site plants easier to set up — the very structure the GST rulings punish.

Certainty. An advance ruling in your own State is the only binding answer for your plant.

Your position

Things to check

    What would make it safer

      The rulings

      reported summaries
      ForumCaseDateWhat it heldFor / against you

      Rulings are quoted from reported summaries; an advance ruling binds only the business that asked for it. Confirm with your CA

      Want a CA to review the structure before you sign, or to seek an advance ruling? Karan does these. Ask CA Karan Gupta →
      Your data never leaves this browser. This page maps your plant's structure to the GST input-tax-credit positions taken in advance rulings and one pending High Court writ (sections 16 and 17 of the CGST Act, Rules 42 and 43). Advance rulings bind only the business that asked for them, and the rulings are quoted from reported summaries. It is not tax advice; for certainty, seek an advance ruling in your State. Statutory rules change; verify against the latest notifications. Rules verified 17 October 2026. Nothing you type is uploaded. Maintained by a practising Chartered Accountant.

      Type the business name and the firm's name to print the note.