Five figures off the balance sheet and the tender notice — the NIT. You get the capacity, the pass or fail, and a certificate ready for your letterhead and UDIN.
List checked 7 Nov 2026. The clause printed in your NIT governs.
Joint venture not a joint venture
Your NIT decides which of these is B. The one in use is marked, and the certificate says which was applied.
Work orders (optional — they add up into the two figures above)
Add even one and the certificate carries an annexure sheet listing them.
Letterhead, UDIN and signature
This wording is a starting draft. Read it against ICAI's Guidance Note on Reports or Certificates for Special Purposes and against your NIT before you sign.
{cname} {authority} {nit} {aFy} {lookWords} {aFig} {updWords} {n} {mult} {bWords} {cWords} {bFig} {capFig} {capWords} {tenderFig} {jvWords} {bidDate}. Delete a brace and the text prints exactly as you typed it.Your answer
Clears on capacity? Check whether this tender pays at your price.
The formula and what each letter means. Assessed available bid capacity is (A × N × 2) − B, where A is the maximum value of works executed (payment received, under Railways) in any one year of the look-back period (usually the last five; three under the Railways clause) brought to today's prices, N is the number of years the tender allows for completion, and B is the value of existing commitments and ongoing works still to be completed. The multiplier is not always 2.
Works executed is not turnover. The clause says "value of works executed in any one year", so trading income, other business income and anything in the accounts that is not works stays out. Overstating A by using turnover is the commonest reason a certificate is challenged.
Why the multiplier is the thing that rejects bids. There is no multiplier in law — ×2 is common in public-works notices, ×1.5 is in live commercial use and ×2.5 is the highway EPC figure, and the difference is the whole answer. That is why the three readings sit on the first screen.
Bringing your best year to today's prices. The classic clause allows 10% a year, many CPWD-format notices 7% a year simple, and highway EPC RFPs a table of factors, and notices differ on the end date. The 10% clauses do not say simple or compound, so this page computes simple and says so on the certificate; a table goes in as a ratio. Where your notice gives a table of yearly factors, type the factor for your year as the index ratio.
Works in hand: over the next N years. Most clauses count what falls due in the next N years. Where a clause says "the next one year", it is usually that tender's own completion period, so read yours. A contractor who uses the wrong period is out by the difference, so this page shows both and prints which was applied.
What this page does not check. Average annual turnover, similar-work experience, net worth, working capital and bid security are separate eligibility gates in the same notice, and none of them is touched here. It does not check who your notice requires to certify these figures.
What can differ in your notice. The multiplier, the updating rate, the look-back period and the definition of works in hand all vary, and this page cannot read your tender. Variant list checked 7 November 2026; departmental rules change, so verify against the tender document and the current Guidance Note before you sign. Maintained by a practising Chartered Accountant.
Your data never leaves this browser — nothing you type is uploaded or stored. The clause printed in your NIT governs; verify it before you sign — maintained by a practising Chartered Accountant.